VIP branch of a Sber Private Banking
A complex of design, construction and installation works in the Fit-out scope, including ventilation and air conditioning, fire protection (sprinkler and gas fire extinguishing), video surveillance, access control systems, water supply and drainage, power supply and other engineering systems.
The activities of our client's employees were carried out in a regular mode. The construction sites were separated by buffer zones, which ensured the absolutely safe stay of customers and staff in the building during the work. The work was carried out in cramped conditions, but this did not thoroughly affect the delivery date of the object. Also, the device of armored structures of cash registers and their certification was carried out.